CERN Accelerating science

Reports

新增:
2015-12-17
15:07
CERN Yellow Report Front Cover High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report / Apollinari, G (ed.) ; Béjar Alonso, I (ed.) ; Brüning, O (ed.) ; Lamont, M (ed.) ; Rossi, L (ed.)
The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built [...]
CERN-2015-005. - Geneva : CERN, 2015. - 285 p.


10.5170/CERN-2015-005
Full text - Chapters in this volume
详细记录 - 相似记录
2015-11-12
15:07
HiLumi LHC Technical Design Report : Deliverable: D1.10 / Bejar Alonso, I (CERN) ; Rossi, L (CERN)
CERN-ACC-2015-0140.- Geneva : CERN, 2015 HiLumiLHC, 1.10 Fulltext: PDF;

详细记录 - 相似记录
2015-10-16
09:48
UCG Report on the ATLAS Phase II Upgrades / Barker, G ; Burrows, P ; Forti, F ; Karyotakis, Y ; Lancaster, M ; Kunne, F ; Moll, M ; Ratcliff, B ; Smith, A J S ; Touramanis, C
CERN-LHCC-2015-023 ; UCG-016.
- 2015.
Full text

详细记录 - 相似记录
2015-10-16
09:41
UCG Report on the CMS Phase II Upgrades / Demarteau, M ; Denisov, D ; Forti, F ; Karyotakis, Y ; Niebuhr, C ; Smith, A J S ; Touramanis, C ; Vasseur, G ; Yamamoto, H
CERN-LHCC-2015-022 ; UCG-015.
- 2015.
Full text

详细记录 - 相似记录
2015-10-13
17:20
Preliminary Collider Baseline Parameters: Deliverable D1.1 / Schulte, Daniel (CERN)
This deliverable provides a preliminary specification of the layout and target operation parameters for the FCC-hh hadron collider concept. They serve as starting point for the studies in all work packages. [...]
CERN-ACC-2015-132.- Geneva : CERN, 2015 Fulltext: PDF;

详细记录 - 相似记录
2015-09-25
19:39
ATLAS Phase-II Upgrade Scoping Document
Final Version of the Scoping Document for Phase-II
CERN-LHCC-2015-020 ; LHCC-G-166.
- 2015.
Fulltext

详细记录 - 相似记录
2015-09-25
12:32
CMS Phase II Upgrade Scope Document / Butler, J (Fermilab) ; Contardo, D (Lyon U.) ; Klute, M (MIT) ; Mans, J (Minnesota U.) ; Silvestris, L (INFN-Bari) ; on behalf of the CMS, Collaboration (-)
The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. [...]
CERN-LHCC-2015-019 ; LHCC-G-165.
- 2015.
Fulltext

详细记录 - 相似记录
2015-09-25
09:29
UCG Report on the TDR for the Upgrade of the ALICE Online-Offline (O2) Computing System / Diaconu, C ; Smith, A J ; Ullrich, T
CERN-LHCC-2015-018 ; UCG-014.
- 2015.
Full text

详细记录 - 相似记录
2015-09-14
15:13
Compensation of the long-range beam-beam interactions as a path towards new configurations for the High Luminosity LHC / Fartoukh, Stephane (CERN) ; Valishev, Alexander (Fermilab) ; Papaphilippou, Yannis (CERN) ; Shatilov, Dmitry (Novosibirsk, IYF)
Colliding bunch trains in a circular collider demands a certain crossing angle in order to separate the two beams transversely after the collision. [...]
CERN-ACC-2015-0095.
- 2015. - 23 p.
Full text - Full text

详细记录 - 相似记录
2015-08-03
09:58
Benchmark scenarios for low $\tan \beta$ in the MSSM / Bagnaschi, Emanuele (DESY) ; Frensch, Felix (Karlsruhe, Inst. Technol.) ; Heinemeyer, Sven (Cantabria Inst. of Phys.) ; Lee, Gabriel (Technion) ; Liebler, Stefan Rainer (DESY) ; Muhlleitner, Milada (Karlsruhe, Inst. Technol.) ; Mc Carn, Allison Renae (Michigan U.) ; Quevillon, Jeremie (King's Coll. London) ; Rompotis, Nikolaos (Seattle U.) ; Slavich, Pietro (Paris, LPTHE) et al.
The run-1 data taken at the LHC in 2011 and 2012 have led to strong constraints on the allowed parameter space of the MSSM. These are imposed by the discovery of an approximately SM-like Higgs boson with a mass of $125.09\pm0.24$~GeV and by the non-observation of SUSY particles or of additional (neutral or charged) Higgs bosons. [...]
LHCHXSWG-2015-002.- Geneva : CERN, 2015 - 24. Fulltext: PDF;

详细记录 - 相似记录