2019-07-10
14:11
The CERN Neutrino Beam to Pyhäsalmi - CN2PY : Conceptual design report / Alabau-Gonsalvo, J (CERN) ; Alekou, A (CERN) ; Antoniou, F (CERN) ; Bartmann, W (CERN) ; Benedikt, M (CERN) ; Berthoux, D (CERN) ; Biskup, B (CERN) ; Bo􏰅ura, L (CERN) ; Calviani, M (CERN) ; Charitonidis, N (CERN) et al.
Geneva : CERN, 2015 Fulltext: PDF;

Detaljerad journal - Similar records
2019-06-14
16:53
Advisory Committee of CERN Users (ACCU) : Minutes of the 123rd Meeting held on 5th March 2019 / Hauschild, Michael
CERN-ACCU-MH-2019-02.- 2019 - 25 p. Fulltext: PDF;

Detaljerad journal - Similar records
2019-06-05
18:11
Upgrade of the TOTEM T2 Telescope, Technical Design Report / TOTEM Collaboration, The
A new T2 detector for the TOTEM experiment is designed to measure the rate of inelastic proton-proton events in low luminosity special runs dedicated to the measurement of the total cross section at the highest LHC energy. [...]
CERN-LHCC-2019-007 ; TOTEM-TDR-004.
- 2019.
Fulltext

Detaljerad journal - Similar records
2019-05-20
15:18
Protons Beyond the LHC Injectors Upgrade Project / Koukovini Platia, Eirini (CERN) ; Bartosik, Hannes (CERN) ; Forte, Vincenzo (CERN) ; Giovannozzi, Massimo (CERN) ; Huschauer, Alexander (CERN) ; Lasheen, Alexandre (CERN) ; Rumolo, Giovanni (CERN) ; Chapochnikova, Elena (CERN)
The Large Hadron Collider (LHC) Injectors Upgrade (LIU) project is implementing major changes during the second long shutdown (LS2) across the injectors complex. The main aim of the project is to improve the performance of the accelerator chain for the production of LHC beams [...]
CERN-PBC-REPORT-2019-004.- Geneva : CERN, 2019 - 35. Fulltext: PDF;

Detaljerad journal - Similar records
2019-05-16
16:00
Cover not available CMS superconducting coil : CMS magnet , pt.2 : superconducting coil, preliminary design report, 7/8 October 1996.
[S.l.] : [s.n.], 1996.
Purchase it for me! - CERN library copies
Detaljerad journal - Similar records
2019-05-16
15:54
ATLAS - 2 : 200 m conductor with EM SC cable : test report
Zurich : ETH, 1996.
CERN library copies
Detaljerad journal - Similar records
2019-05-10
11:18
Constraining EFT parameters using simplified template cross sections / Hays, Chris (University of Oxford (GB)) ; Sanz Gonzalez, Veronica (CERN) ; Zemaityte, Gabija (University of Oxford (GB))
We discuss a procedure for fitting a set of dimension-6 effective field theory param- eters using simplified template cross section measurements. The steps are to determine equations relating the parameters to the cross sections, choose the fit parameters and external constraints, and perform the fit. [...]
LHCHXSWG-2019-004.- Geneva : CERN, 2019 - 21. Fulltext: PDF;

Detaljerad journal - Similar records
2019-05-09
04:46
Cover not available Detector Technologies for CLIC / Dannheim, D. ; Krüger, K. (ed.) ; Levy, A. (ed.) ; Nürnberg, A. (ed.) ; Sicking, E. (ed.)
The Compact Linear Collider (CLIC) is a high-energy high-luminosity linear electron-positron collider under development [...]
arXiv:1905.02520 ; CERN-2019-001 - 2019. - 152 p. (CERN Yellow Reports: Monographs ; 1/2019)


publication
Fulltext - CERN library copies
Detaljerad journal - Similar records
2019-05-08
12:02
LHCb SMOG Upgrade / LHCb Collaboration, CERN (Meyrin)
A proposal for an upgraded version of the existing gas injection system for the LHCb experiment (SMOG) is presented. [...]
CERN-LHCC-2019-005 ; LHCB-TDR-020.
- 2019.
Full text

Detaljerad journal - Similar records
2019-05-02
11:55
Recommended Accelerator follow-up R&D: Milestone M2.6 / Schulte, Daniel (CERN) ; Zimmermann, Frank (CERN)
This milestone documents the gaps between the results of the particle collider conceptual design study and the level of detail required to enter a project construction preparatory phase. This document establishes a portfolio of suggested R&D; topics related to the domain of particle collider design and associated technologies that need to be addressed with high priority in a follow-up project in order to come to a consistent and coherent design on which a project construction preparation can be based..
CERN-ACC-2019-0046.- Geneva : CERN, 2019 Fulltext: PDF;

Detaljerad journal - Similar records